For residential tower developers

Parcels go up the building. Delivery staff don't.

Elivate is a dedicated parcel lift built into each tower. Agents drop parcels at a ground-floor kiosk, a carriage takes them up the tower's own shaft, and each one waits in a locker on the resident's floor until they open it with a PIN or QR code.

In development. Engineering is complete and the first units are in build. Aurm is taking projects for towers now, and we confirm the installation window project by project.

Kaveri Crest demo society at dusk, six residential towers around a central lawn
Kaveri Crest at dusk. Every image on this page is rendered from the live model below.
Up to 50 floorsOne shaft threads the full height of the tower
Every floorA locker point in the lift lobby, beside the passenger lifts
Built for peak hourRiders queue at a kiosk, never in the lifts; one carriage serves every floor
End-to-end by AurmEngineering, installation and maintenance
The problem

Deliveries have outgrown the lobby

Lifts

Passenger lifts carry parcels all day

Agents going floor to floor compete with residents for lifts at the busiest hours.

Security

Strangers on residential floors

Every door-to-door delivery puts someone unknown in the corridors.

Operations

Guards log, track and escort

Front-desk staff lose hours to deliveries instead of security.

Live model

Explore Kaveri Crest

A six-tower demo society with Elivate in every tower. Pick a tower, floor and flat, then watch the journey from the delivery person's, the parcel's or the resident's point of view.

Kaveri Crest · Demo
Society overview
6 towers · Elivate in every tower
System ready. Choose a view to start.
Drag to orbit · click, then scroll to zoom
Building Kaveri Crest

Kaveri Crest is a fictional society built for this demo. It runs best on a laptop or desktop browser.

How it works

Four hand-offs, and none of them on a residential floor

Delivery agent scanning a parcel at the Elivate ground-floor kiosk1 · Ground floor

Agent drops at the kiosk

Security clears the agent at the gate. The kiosk scans the parcel, matches the flat and reserves a locker on that floor.

Parcel on the carriage rising inside the Elivate shaft2 · Shaft

Carriage lifts the parcel

A conveyor feeds the carriage, which rises on guide rails in the tower's own shaft. Passenger lifts stay free.

Elivate locker bank in a residential lift lobby3 · Floor locker

Loaded from behind

A shuttle lines up with the reserved compartment and pushes the parcel in from the shaft side.

Resident collecting a parcel from an open Elivate locker4 · Resident

PIN or QR opens the door

The resident is notified the moment the parcel is stored, and collects it whenever they like.

For the resident

No doorbell, no waiting in, no missed delivery

A resident never meets the delivery agent and never has to be home. The parcel is already on their floor by the time they hear about it.

  1. The parcel arrives downstairsThe agent is cleared at the gate and hands it over at the ground-floor kiosk. Nobody goes above the ground floor.
  2. A notification, the moment it is storedIt names the floor, the locker and the code. Nothing has to be answered or accepted.
  3. Collection in their own lift lobbyThe Elivate point sits beside the passenger lifts on their floor. PIN on the keypad, or the QR at the scanner.
  4. One code, one compartmentThe code opens their locker and nothing else. They collect whenever they like.

Each floor in the demo carries 12 compartments, four small, four medium and four large, so a bulky parcel and a book both have somewhere to go. The mix is set against your flat count during design.

6:425G
ELIVATE · NOW
Your parcel is ready
Tower A · Floor 12 lift lobby · Locker B3
PIN
4827
Enter the PIN on the keypad or scan the QR at the Elivate point on your floor.
What the resident sees. The same notification appears in the live model when you run the customer view.
Peak hour

Eight riders at once. Nobody goes upstairs.

The evening rush is where door-to-door delivery breaks down. In the model's peak-hour view, eight riders arrive within half a minute. Security clears them one by one, they keep left on the one-way loop and park only in the tower's marked two-wheeler bay, and they queue at the kiosk while the buffered intake and the carriage work through the parcels floor by floor.

Delivery agents queueing at the Elivate kiosk in a tower lobby during peak hour
Peak hour at the Tower A kiosk: one agent scanning, the next at the queue line. Open the live model and choose "Peak hour" to watch the whole scenario.
Developer value

Why builders add Elivate to flagship projects

Future-ready amenity

A landmark feature that marks the project as genuinely modern.

Premium differentiation

Sets flagship towers apart from conventional stock.

Less lift congestion

Parcels stop competing with residents for passenger lifts.

Better resident experience

No lobby waits, no doorstep clutter, no missed deliveries.

Better security

No delivery agents moving through residential floors. Riders are checked at the gate and park only in marked bays.

Lower operational load

Guards stop logging, tracking and escorting daily deliveries.

Engineering

Indicative specification

These figures are for discussion only. Items tagged as model assumptions are illustrative values used to build the demo, and final dimensions are confirmed with your design team.

ParameterValueNotes
Floors servedUp to 50Kaveri Crest towers are 20 to 30 floors
Shaft clear size~2.6 × 1.9 mMODEL ASSUMPTIONReaches the back of a 4-column locker bank
Floor locker bank~2.6 × 2.35 × 0.6 mMODEL ASSUMPTIONPlus a 0.7 m panel with screen, keypad and QR scanner
Compartments per floor12MODEL ASSUMPTION4 small · 4 medium · 4 large, for 6 to 8 flats
Ground intake kiosk~3.4 m wideBarcode scanner, touchscreen, intake hatch, conveyor
Resident accessPIN or QRSent to the resident's phone when the parcel is stored
Carriage speed2.0 m/sMODEL ASSUMPTIONUsed for the timings below
PowerStandard electricalLow draw, compatible with back-up power
Install and maintenanceEnd-to-end by AurmThe project provides space and power
TowerTravel to top floorIntake to locker, top floor
Partnering

What the project provides

Space

A shaft in each tower core, a small ground-floor footprint for the intake kiosk, and wall space in each lift lobby for the locker bank. Exact dimensions are fixed together during design.

Power

A standard electrical connection for the carriage, lockers and kiosk. Aurm handles engineering, installation and maintenance.

Where it stands

In development, and open for projects

Elivate is not installed in a tower yet. It is being built, and Aurm is taking projects now so that the shaft is in your drawings before the structure is fixed. Here is exactly where the product is.

  1. System designHow the kiosk, shaft, carriage and floor lockers work together
  2. EngineeringDrawings, dimensions and the specification below
  3. First build runUnits in build. Project slots are open
  4. First installationsConfirmed project by project, against your construction programme
Settled

The system design, the sequence from kiosk to floor locker, and the indicative specification in the table above. None of that changes project to project.

Fixed with you

Shaft clear dimensions, the locker bank size in each lift lobby, the compartment mix for your flat count, and the installation window against your programme.

What happens next

Send us the tower drawings. We review them with your design team, mark the shaft and the lobby positions, and come back with a written proposal.

About Aurm

Elivate is new. Aurm is not.

Aurm builds, installs and runs secure hardware inside residential buildings. Elivate is the second product to come out of that work, and the same team engineers, installs and maintains it.

21 vaults running

Aurm smart safe deposit vaults operate in societies across Bengaluru, Hyderabad and Visakhapatnam, including Prestige Primrose Hills, Brigade Meadows Plumeria, Purva Skywood and Adarsh Palm Retreat.

From the founding team of MyGate

The team that built India's largest gated-community platform, with backgrounds in the Armed Forces, residential security and premium brands.

Audited and certified

ISO 9001:2015 for quality management, ISO 27001:2022 for information security, BIS certified, and CERT-In empanelled for independent security auditing.

Aurm works with Axis Bank and DBS Bank, and insures locker contents with TATA AIG and ICICI Lombard. aurm.in

Questions

The ones developers ask first

Does Elivate replace the passenger lifts?

No. It is a separate shaft that carries nothing but parcels. The passenger lifts are freed up, not shared.

Do delivery agents still come up to the flat?

No. The hand-off happens at the ground-floor kiosk. No delivery agent goes above the ground floor, and none reaches a residential corridor.

How does a resident open their locker?

With a PIN on the keypad or a QR code at the scanner, at the Elivate point in their own lift lobby. The code reaches them the moment the parcel is stored, and it opens one compartment.

How tall a tower can one shaft serve?

Up to 50 floors. The demo towers at Kaveri Crest run from 20 to 30 floors, with a locker point on every floor.

How many parcels can a floor hold at once?

Twelve compartments per floor in the demo, four small, four medium and four large, serving six to eight flats. That mix is a model assumption, and the real one is set against your flat count during design.

How long does a parcel take to reach the floor?

About 34 seconds from the kiosk to Floor 12 of a 20-floor tower, and about 47 to 63 seconds to the top floor depending on tower height. These are model estimates at a carriage speed of 2.0 metres per second.

What does the project have to provide?

A shaft in each tower core, a small ground-floor footprint for the intake kiosk, wall space in each lift lobby for the locker bank, and a standard electrical connection. Aurm handles engineering, installation and maintenance.

Is Elivate running in a tower today?

No. It is in development, and every image and timing on this page is produced from the live model rather than from an installed system. Aurm is taking projects now so that the shaft is in your drawings before the structure is fixed.

Who is behind it?

Aurm, from the founding team of MyGate. Aurm runs 21 smart safe deposit vaults in societies across Bengaluru, Hyderabad and Visakhapatnam, and is ISO 9001 and ISO 27001 certified, BIS certified and CERT-In empanelled.

Fire, electrical and approval questions, service terms and commercials are answered project by project. Send us the project and our engineering team will take them one by one.

Talk to us

Put Elivate in your next tower

Tell us about the project. We come back with the shaft and lobby requirements for your drawings, and a written proposal.

1
A call with our engineering team, usually the same week.
2
We mark the shaft and the floor locker positions on your tower drawings.
3
A written proposal with the specification, the installation window and commercials.

Or reach us directly.
+91 97407 41016
WhatsApp


We use this only to answer your enquiry. No newsletters.

See the whole journey, from gate to locker, in one take